# csv2journal Milestone 1 Build Plan The route. [DESIGN_M1.md](DESIGN_M1.md) is the destination and is authoritative for which module owns which requirement; [PROCESS.md](PROCESS.md) governs how the work is done. Each task had a file in `docs/tasks/` carrying its own `status`, and every one of the 181 requirement IDs appeared in **exactly one** task. Those files were removed once the milestone closed: everything in them had been absorbed into the tests, the code and DESIGN_M1.md, and what remained read like a live specification while being a finished plan. The table below is kept as the record of the order the work was done in. `jj` history has the files if they are ever wanted. Tasks are sized to be reviewable in one sitting (`PROCESS.md` §1). No task closes a whole subsystem. ## Order | # | Task | Closes | Depends | | --- | --- | --- | --- | | T01 | packaging skeleton | 6 | — | | T02 | diagnostics | 4 | T01 | | T03 | decimal | 4 | T02 | | T04 | yaml event layer | 8 | T02 | | T05 | yaml schema decode | 5 | T04 | | T06 | manifest and profile | 5 | T05 | | T07 | rules model | 5 | T05 | | T08 | expression lexer and parser | 7 | T03, T07 | | T09 | regex binding | 2 | T08 | | T10 | expression evaluation | 4 | T09 | | T11 | CSV lexical layer | 9 | T02 | | T12 | CSV field mapping | 8 | T11 | | T13 | row conversion | 4 | T03, T12 | | T14 | template syntax and validation | 7 | T13 | | T15 | template rendering | 9 | T14 | | T16 | journal model and emission | 11 | T15 | | T17 | journal parsing and comparison | 8 | T16 | | T18 | discovery and snapshots | 13 | T06 | | T19 | engine | 14 | T10, T17, T18 | | T20 | finalization | 5 | T16, T18 | | T21 | command-line interface | 10 | T19, T20 | | T22 | server lifecycle | 5 | T21 | | T23 | read-only state view | 6 | T22 | | T24 | rule editing and save | 9 | T23 | | T25 | preview and interactive finalization | 5 | T24 | | T26 | compatibility and determinism | 8 | T25 | ## Phases 1. **Foundation** — T01–T03. Nothing else builds without these. 2. **Configuration** — T04–T07. 3. **Matching** — T08–T10. 4. **CSV and rows** — T11–T13. 5. **Templates** — T14, T15. 6. **Journal** — T16, T17. 7. **Project** — T18–T20. 8. **Command line** — T21. 9. **Web interface** — T22–T25. 10. **Cross-cutting** — T26. T11 depends only on T02, so phase 4 can run in parallel with phases 2–3. T18 depends only on T06 and can start as soon as the manifest loads. ## Blocked items None. The two that existed are resolved: DESIGN_M1.md §11.1 (whitespace-only posting comments) and R5 (hledger 1.52.3 availability, with its URL and hash recorded in §10.3). ## Sizing Largest tasks are T19 (engine, 14) and T18 (discovery, 13). Both are single coherent modules whose requirement IDs are individually small; neither spans a subsystem. The web interface is deliberately four tasks rather than one, so each is reviewable and carries its own status.