# Milestone 0 Decision Log ## Purpose Record end-of-milestone decisions tied to evidence, not assumptions. ## Locked Scope Decisions - Milestone 0 is research + proof, not production shipping. - Timing contract must distinguish render-phase, post-render, and post-paint. - Hydration safety requires deterministic SSR output and mount-gated animation start. - Presence proof is the current retained-child prototype, not the older `createRoot` retention path. - Layout starts explicit invalidation-first (`layoutDependency`) before observer automation. - `attrEffect` remains conditional with fallback path due to alpha status. - Do not widen unimplemented public props during closeout. Keep them deferred until later milestones. ## Included In Milestone 0 - `motion.div` viability with stable namespace access. - `motion.create(...)` viability with cached wrappers and forwarding-mode separation. - adapter sufficiency for the current Solid 1 runtime bridge. - deterministic pre-mount style resolution. - retained-child presence through `PresenceChild` and single-slot `AnimatePresence`. - explicit-invalidation layout proof through the demo reorder route. ## Deferred Beyond Milestone 0 - gestures, drag, and press parity - keyed list `AnimatePresence` - shared layout and layout groups - broader viewport and scroll semantics - Solid 2-specific runtime work - any public prop that exists only as a placeholder and has no local proof yet ## Required Exit Decisions 1. `motion.div` viability - Status: Complete - Evidence: `src/component/motion.test.tsx` proves stable namespace access. 2. `motion.create` viability - Status: Complete - Evidence: `src/component/motion.test.tsx` proves wrapper caching and forwarding-mode separation. 3. Adapter contract sufficiency - Status: Experimental, sufficient for Milestone 0 - Evidence: current runtime bridge in `src/adapter/solid1.ts`, plus the proof surfaces exercised by `src/component/motion.test.tsx`, `src/presence/animate-presence.test.tsx`, and the demo routes. 4. Presence strategy (retained child record) - Status: Complete for the prototype scope - Evidence: `src/presence/animate-presence.test.tsx` plus the retained-exit demos on `/presence`. 5. Layout MVP policy (explicit invalidation) - Status: Complete for the prototype scope - Evidence: `demo/src/routes/layout.tsx` exercises reorder measurement and the larger explicit-invalidation layout probes with `layoutDependency`. 6. Runtime reuse keep/adapt/avoid set - Status: Draft complete - Evidence: `motion-source-map.md`. 7. Solid 2 isolation strategy - Status: Draft complete - Evidence: `solid2-risk-register.md`. ## Promotion Rule to Milestone 1 Only promote behaviors with documented contract + local proof evidence. Keep unresolved items experimental.